So Kevin and I were at the site yesterday during the day and toured alot of the homes.
There are 3 hillcrests being constructed right now so we were super happy to be able to tour them!
Since it was daylight, we could finally see into the basement when we went in.... now here lies the problem... They all have their rough in (baths) and we don't.
As soon as they poured our foundation, we thought something was a little bit off. We just thought they had moved our rough in from the floor plan. Then when touring the other Hillcrests, they all there rough in in the same spot and the other "pipes" (I don't know what they are) in the same spots as us. We then realized we don't have a rough in :( And they had poured our concrete floors already too!
I'm going to call up the construction office and see what they say.
I've always read about them forgetting about things, but you never really expect it to happen to your house! :(
There are 3 hillcrests being constructed right now so we were super happy to be able to tour them!
Since it was daylight, we could finally see into the basement when we went in.... now here lies the problem... They all have their rough in (baths) and we don't.
As soon as they poured our foundation, we thought something was a little bit off. We just thought they had moved our rough in from the floor plan. Then when touring the other Hillcrests, they all there rough in in the same spot and the other "pipes" (I don't know what they are) in the same spots as us. We then realized we don't have a rough in :( And they had poured our concrete floors already too!
I'm going to call up the construction office and see what they say.
I've always read about them forgetting about things, but you never really expect it to happen to your house! :(